CBM Drilling 5 Stage Solids Control System for India Drilling Company

GN Solids Control recently completed the manufacturing and factory acceptance test of a 5 stage solids control system, which will be shipped to an Indian drilling contractor for their CBM Drilling project. This engineered mud processing package is purpose-built to handle coalbed methane drilling mud, efficiently separate drilled solids, maintain stable mud density and reduce overall operational cost for on-site drilling operations.




